Phase 1 of the 2.5 sq. km site is now in operation, with 25,000 sq.
m of labs, incubator and technology workspace ready for use. Built over
5 floors, all labs and workspaces are finished adequately, equipped
with central air conditioning, lighting, power outlets, smoke detectors
and water sprinklers, and connected to the campus broadband, allowing
users to start-up quickly with minimal worries as to engineering modifications
of the unit.